Project Description
CLIENT | Accommodation Vessel Owner
ASSET | Accommodation Vessel
DATE | 2022
LOCATION | Brazil
Overview
CTS was invited by the Accommodation Vessel Owner/operator to provide one Rope Accesswelding 6G team and two teams of R/A U.H.P. blasters & painters, for renewal of braces on the PS and SBS crane boom under the supervision and instructions of the maker’s FavelleFavco. The R/A blasting and coating team was to descale the crane boom mechanically, clean chemically / U.H.P. W. Jet blasting, and then paint with 2 coats of primer and yellowtop coat. CTS provided all the R/A equipment, consumables, and equipment required for the blasting and coating teams. The team was handpicked from our pool of skilled ex-shipyard pipe and steel fitters/welders with very good knowledge and relevant certificates. Experienced Blasting/Coating teams were deployed for the project
Scope of Works
• Braces: Total renewal of 38 braces (26 on the port boom and 8 on the STBD boom)• De-scaling and painting booms with two stripe coats of primer paint and top yellow coat full paint apply on booms
• CTS along with the Client, ensured all areas of work had no presence of debris and oil.• All the passageways cleared from any obstacles for easy access.
• Hot work was minimized, and major cutting and welding were conducted only after approval from Safety inspector
• All electrical equipment checked by Client electrical and HSE department and lock out and tag out system was put into use
Project Gallery
Result
The project was delivered safely, within time and quality to the Client