A 3D scan of the vessel’s engine liners was taken to analyze corrosion the maximum diameter, wear rates and ovality. CTS used advanced equipment to ensure the project was completed with precision and on time. The inspection was completed without engine immobilization and removal of engine mounting.

Read more here.